Important: The new O-ring seals must be lubricated with mineral base 525 viscosity
refrigerant oil.
- Install the new O-ring seals onto the condenser and evaporator lines.
Refer to
O-Ring Replacement
in HVAC.
- Install the two stage
orifice (3).
- Connect the condenser line nut (2) at the two stage orifice, hand
tight .
- Connect the evaporator line nut (1) at the two stage orifice,
hand tight.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the condenser
line nut (2) at the two stage orifice.
Tighten
Tighten the condenser line nut to 27 N·m (20 lb ft).
- Install the evaporator line nut (1) at the two stage orifice.
Tighten
Tighten the evaporator line nut to 36 N·m (26 lb ft).
- Connect the electrical
connector (2).
- Install the two stage orifice harness retaining nut (1).
Tighten
Tighten the two stage harness nut to 3.3 N·m (29 lb in).
- Install the liquid line/suction line bracket.
- Install the vacuum brake booster. Refer to
Power Vacuum Brake Booster Replacement
in Hydraulic Brakes.
- Install the air cleaner assembly. Refer to
Air Cleaner Assembly Replacement
in Engine Controls.
- Evacuate and recharge the A/C system. Refer to
Refrigerant Recovery and Recharging
in HVAC.
- Leak test the filling(s) of the repaired or reinstalled component
using J 39400
.