Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
1 | Did you perform the Power Windows System Check? | -- | Go to Step 2 | |||||
2 |
Does the voltage measure at the specified value? | B+ | Go to Step 3 | Go to Step 6 | ||||
3 |
Does the voltage measure at the specified value? | B+ | Go to Step 4 | Go to Step 7 | ||||
4 | Verify that the master switch assembly connector is mated correctly. Is the connector OK? | -- | Go to Step 5 | Go to Step 8 | ||||
5 | Replace the master switch assembly. Refer to the following procedures: Is the repair complete? | -- | -- | |||||
6 | Repair an open in CKT 141. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||
7 | Repair an open in CKT 150. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |||||
8 | Repair the faulty connector. Refer to Connector Repairs in Wiring Systems. Is the repair complete? | -- | -- |