• | The moldings are serviced as two pieces. |
• | When you remove the drip rail moldings, be careful not to bend the moldings. |
1.1. | Slide the roof drip rail molding over the roof flange. |
1.2. | Ensure the roof drip rail molding fits tight to body. |
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the front half of the drip rail molding screws to 2 N·m (18 lb in).
Tighten
Tighten the rear half of the drip rail molding screws to 2 N·m
(18 lb in).