Removal Procedure
- Remove the IP carrier support. Refer to
Instrument Panel Carrier Support Replacement
in Instrument Panel, Gages and
Console.
- Remove the defroster bolts (1).
- Disconnect the vacuum harness at the retainers.
- Disconnect the vacuum
lines from the actuators.
- Remove the retaining screws and the distributor from the A/C distributor
assembly (2) .
- Remove the air distribution
duct (1).
Installation Procedure
- Install the distributor
assembly (2) to the vehicle.
- Connect the vacuum lines to the distributor.
- Connect the vacuum lines to the actuators.
- Install the fasteners (1)
into the defroster duct.
- Install the IP carrier support. Refer to
Instrument Panel Carrier Support Replacement
in Instrument Panel, Gages and
Console.