Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Tilt/Telescoping Steering Column System Check performed? | -- | ||
2 |
Is the measured voltage in the range shown? | 10--15V | ||
3 | Repair open in CKT 2840 (ORN). Is the circuit repair complete? | -- | -- | |
4 | Connect a DMM between the TTM connector C1 terminal D and ground. Is the measured voltage in the range shown? | 10--15V | ||
5 | Repair open in CKT 2940 (ORN). Is the circuit repair complete? | -- | -- | |
6 | Connect a DDM between the TTM connector C1 terminal C and battery positive voltage (B+). Is the measured voltage in the range shown? | 10--15V | ||
7 | Connect a DDM between ground splice pack G200 terminal J and battery positive voltage (B+). Is the measured voltage in the range shown? | 10--15V | ||
8 | Repair open CKT 350 (BLK). Is the circuit repair complete? | -- | -- | |
9 | Check that ground terminal G200 is clean and tight. If OK, replace ground splice pack G200. Is the replacement complete? | -- | -- | |
10 |
Is the replacement complete? | -- | -- | |
11 |
Is the system check complete? | -- | System OK | -- |