Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
DEFINITION: The rear blower does not operate at any speed. | ||||
1 |
Install the Scan Tool . Is the rear integration module (RIM) requesting operation of the rear blower? | -- | Go to Step 2 | Go to Step 5 |
2 | Measure voltage at the rear blower motor terminal A. Is voltage measured greater then the specified value? | 10.5 V | Go to Step 6 | Go to Step 3 |
3 | Measure voltage between RR BLO relay terminal E8 and ground. Is voltage at specified value? | 0 V | Go to Step 11 | Go to Step 4 |
4 | Inspect CKT 1592 (TAN) for an open. Was an open condition repaired in CKT 1592 (TAN)? | 12 V | Go to Step 12 | Go to Step 9 |
5 | Measure voltage at terminal J of the rear blower switch and ground. Is voltage measured greater than the specified value? | 10.5 V | Go to Step 7 | Go to Step 6 |
6 | Check CKT 1052 (ORN) for an open. Was an open repaired in CKT 1052 (ORN)? | -- | Go to Step 12 | Go to Step 8 |
7 | Measure voltage between rear blower motor switch terminal A and ground. Is voltage greater than the specified value? | 10.5 V | Go to Step 9 | Go to Step 10 |
8 | Inspect CKT 350 (BLK) for an open condition. Was an open condition repaired? | -- | Go to Step 12 | -- |
9 | Replace rear integration module (RIM). Refer to Body Control Module Replacement in Body Control Systems. Is the repair complete? | -- | Go to Step 12 | -- |
10 | Replace the rear blower switch. Is the repair complete? | -- | Go to Step 12 | -- |
11 | Replace the RR BLO relay. Is the repair complete? | -- | Go to Step 12 | -- |
12 | Confirm proper operation of the rear blower motor. Is the rear blower motor operation correctly? | -- | System OK | -- |