Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Data Link Communications System Check performed? | -- | Go to Step 2 | |
2 |
Is there continuity present? | -- | Go to Step 3 | Go to Step 4 |
3 | Replace the ECC module. Refer to Control Assembly Replacement . Is the repair complete? | -- | -- | |
4 | Connect the DMM between terminal 2 of the DLC and splice S201. Is there continuity present? | -- | Go to Step 5 | Go to Step 6 |
5 | Connect the DMM between terminal 2 of the DLC and terminal C11 of the ECC module. Is there continuity present? | -- | Go to Step 7 | |
6 | Locate and repair the open or cause of resistance in CKT 1807 (PPL) between the DLC and splice S201. Is the repair complete? | -- | -- | |
7 | Locate and repair the open or cause of resistance in CKT 1807 (PPL) between terminal 2 of the DLC and terminal C11 of the ECC module. Is the repair complete? | -- | -- |