Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Power Windows System Check performed? | -- | Go to Step 2 | Refer to Power Windows System Check |
2 |
Is ignition voltage present? | IGN+ | Go to Step 4 | Go to Step 3 |
3 | Locate and repair the open or the high resistance in CKT 1001 (DK GRN) between the RH Front door lock and side window switch connector and terminal D of the side window lockout switch. Is the repair complete? | -- | Refer to Power Windows System Check | -- |
4 |
Is ignition voltage present? | IGN+ | Go to Step 8 | Go to Step 5 |
5 | Inspect for a poor connection at the side window lockout switch. Is the connection OK? | -- | Go to Step 7 | Go to Step 6 |
6 | Repair the connection as necessary. Is the repair complete? | -- | Refer to Power Windows System Check | -- |
7 | Replace the side window lockout switch. Is the repair complete? | -- | Refer to Power Windows System Check | -- |
8 |
Is ignition voltage present? | IGN+ | Go to Step 10 | Go to Step 9 |
9 | Locate and repair the open or the high resistance in CKT 1307 (DK BLU), terminal B at the side window lockout switch and terminal B at the RH rear side window switch connector. Is the repair complete? | -- | Refer to Power Windows System Check | -- |
10 | Replace the RH rear side window switch. Is the repair complete? | -- | Refer to Power Windows System Check | -- |