Removal Procedure
Tools Required
J 39500-B R-134a Refrigerant
Recovery, Recycling and Recharging (ACR4) System
- Recover the refrigerant. Refer to Refrigerant Recovery and Recharging
.
- Remove the upper closeout panel.
- Disconnect the connection from the condenser (3). Discard the
O-ring seal.
- Remove the tube from the retaining clip (6) located on
the body side rail.
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Remove the tube from the evaporator. Discard the O-ring seals.
- Lower the vehicle.
- Remove the evaporator tube (4).
Installation Procedure
- Set the evaporator tube (4) in place.
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the tube
to the evaporator. Use the O-ring seals.
Tighten
Tighten the fitting to 24 N·m (18 lb ft).
- Lower the vehicle.
- Install the tube to the retraining clip (6) located on
the body side rail.
- Connect the connection condenser (3). Use the new O-ring
seals.
Tighten
Tighten the nut to 16 N·m (12 lb ft).
- Install the upper closeout panel.
- Evacuate and charge the A/C system. Refer to Refrigerant Recovery and Recharging
.