The lumbar bladders and bolster bladders are serviced as one lumbar/lateral bladder system. The bladder system is serviced separate from the module assembly. The bladder service part is supplied with the necessary connector fittings. The bladder to module hoses are labeled #3, #4, and #5 to aid in assembly.
It may be necessary to position the seat in the vehicle.
8.1. | Position the hose so it is just over the edge of the barb on the attaching fitting. |
8.2. | Apply the adhesive completely around the fitting. |
8.3. | Quickly push the hose the rest of the way onto the fitting. |