J 39400-A Halogen Leak Detector
Important: Cap or tape the open compressor hose and the accumulator immediately to prevent contamination.
Important: Prior to removal, take note of the accumulator alignment to the accumulator hose and the rear evaporator tube.
Important: Cap or tape the open accumulator hose and the accumulator immediately to prevent contamination.
This measurement will be used during installation of the replacement accumulator.
3.1. | Remove the paper backing from the lower insulator (1). |
3.2. | Position and install the insulator (1) to the bottom of the accumulator (2) as shown. |
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the fitting to 41 N·m (30 lb ft).
Tighten
Tighten the nuts to 10 N·m (89 lb in).
Tighten
Tighten the bolt to 10 N·m (89 lb in).
Tighten
Tighten the bolt to 20 N·m (15 lb ft).
Tighten
Tighten the nut to 10 N·m (89 lb in).