Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Interior Lamps System Check? | -- | Go to Step 2 | |
2 |
Doess the voltage measure at the specified value? | B+ | Go to Step 3 | Go to Step 11 |
3 |
Does the voltage measure at the specified value? | B+ | Go to Step 4 | Go to Step 5 |
4 | Use the J 39200 DMM in order to measure the voltage between the A terminal and the C terminal of the dome lamp connector. Does the voltage measure at the specified value? | B+ | Go to Step 6 | Go to Step 7 |
5 | Repair the open in CKT 1732 between the left IP junction block and the dome lamp. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
6 | Use the J 39200 DMM in order to measure the voltage between the B terminal and the C terminal of the dome lamp connector. Does the voltage measure at the specified value? | B+ | Go to Step 8 | Go to Step 9 |
7 | Use the J 39200 DMM in order to measure the voltage between the left IP junction block C3 connector and B+ and between the C10 connector and B+. Does the voltage measure at the specified value? | B+ | Go to Step 10 | Go to Step 11 |
8 | Replace the dome lamp. Refer to Dome Lamp Replacement . Is the repair complete? | -- | -- | |
9 | Repair the open in CKT 750 between the dome lamp and the ground splice pack G401. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
10 | Repair the open in CKT 156 between the left IP junction block and the dome lamp. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
11 | Replace the left IP junction block. Refer to Relay/Fuse Center Replacement in Wiring Systems. Is the repair complete? | -- | -- |