Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
Important: Perform the following steps In order to avoid misdiagnosis:
| ||||||||
1 | Did you perform the HVAC Air Delivery System Check? | -- | Go to Step 2 | |||||
2 | Inspect the fuse block for an open in Fuse 4. Is Fuse 4 open? | -- | Go to Step 3 | Go to Step 4 | ||||
3 |
Is the repair complete? | -- | System OK | -- | ||||
4 |
Is the measured voltage within the specified range? | 9-14 V | Go to Step 8 | Go to Step 5 | ||||
5 | Use a DMM in order to probe between the heater-A/C control harness connector C2 terminal B7 and ground. Is the measured voltage within the specified range? | 9-14 V | Go to Step 7 | Go to Step 6 | ||||
6 | Locate and repair a poor connection or an open in CKT 41 (BRN) between the fuse block terminal D10 and splice S233. Is the repair complete? | -- | System OK | -- | ||||
7 | Locate and repair a poor connection or an open in CKT 150 (BLK) between S213 and G205. Is the repair complete? | -- | System OK | -- | ||||
8 | Replace the heater-A/C control. Refer to Control Assembly Replacement . Is the repair complete? | -- | System OK | -- |