Removal Procedure
- Remove the battery ground negative cable.
- Remove the Instrument panel carrier. Refer to IP carrier Replacement
in this section.
- Remove the electrical connectors.
- Remove the fuse block (1)
from the tie bar, by pressing the retainer and pushing inward.
- Remove the wire terminals from the fuse block.
Installation Procedure
- Install the wires and
terminals to the fuse block (1).
- Install the fuse block to the tie bar.
- Install the electrical connectors.
- Install the instrument panel carrier. Refer to IP
Carrier Replacement in this section.
- Install the battery ground negative cable.