Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Does the test lamp light? | -- | ||
2 | Connect a test lamp between terminals A and D on the C105 front chassis harness connector. Does the test lamp light? | -- | ||
3 | Repair the open in CKT 9 (BRN) between S126 and terminal A in the C105 front chassis harness connector. Is the repair complete? | -- | System OK | -- |
4 |
Does the DMM indicate continuity? | -- | ||
5 | Repair the open in CKT 150 (BLK) between G107 and terminal D in the front chassis harness connector C105. Is the repair complete? | -- | System OK | -- |
6 | Repair the open in CKT 150 (BLK) between S105 and terminal D in the front turn signal harness connector C105. Is the repair complete? | -- | System OK | -- |
7 | Repair the open in CKT 9 (BRN) between S102 and terminal A in the front turn signal harness connector. Is the repair complete? | -- | System OK | -- |