Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Automatic Transmission Shift Lock Control System Check ? | -- | Go to Step 2 | Go to Automatic Transmission Shift Lock Control System Check |
2 |
Is the measured voltage in the specified range? | 10-15V | Go to Step 3 | Go to Step 4 |
3 | Connect a fused jumper between the park/neutral position switch connector terminal B (PNK) and C (LT GRN). Does the shift interlock solenoid hold the gear selector lever in PARK with the brake pedal not pressed? | -- | Go to Step 5 | Go to Step 6 |
4 |
Is the repair complete? | -- | Go to Step 15 | -- |
5 |
Is the measured voltage in the specified range? | 10-15V | Go to Step 7 | Go to Step 8 |
6 |
Is the repair complete? | -- | Go to Step 15 | -- |
7 | Connect a DMM between the stoplamp/BTSI switch connector C1 terminal A (LT GRN) and B (DK GRN/WHT). Is the measured voltage in the specified range? | 10-15V | Go to Step 9 | Go to Step 10 |
8 | Repair the open in CKT 275 (LT GRN). Is the repair complete? | -- | Go to Step 15 | -- |
9 |
Is the measured voltage in the specified range? | 10-15V | Go to Step 11 | Go to Step 12 |
10 |
Is the repair complete? | -- | Go to Step 15 | -- |
11 | Connect a DMM between the shift interlock actuator connector terminal A (DK GRN/WHT) and B (BLK). Is the measured voltage in the specified range? | 10-15V | Go to Step 14 | Go to Step 13 |
12 | Repair CKT 1135 (DK GRN/WHT) for an open. Is the repair complete? | -- | Go to Step 15 | -- |
13 |
Is the repair complete? | -- | Go to Step 15 | -- |
14 |
Is the repair complete? | -- | Go to Step 15 | -- |
15 |
Is the system check complete? | -- | System OK | -- |