- Apply a 5 mm (0.189 in) bead of RTV sealer, GM P/N 12346192
or the equivalent, to the front of the engine block. Extend the bead 13 mm
(0.5 in) up each cylinder in order to the seal and retain the gaskets.
- Apply a 5 mm (0.189 in) bead of RTV sealer, GM P/N 12346192
or the equivalent, to the rear of the engine block. Extend the bead 13 mm
(0.5 in) up each cylinder in order to the seal and retain the gaskets.
- Install the intake manifold with the new gaskets.
- Install the intake manifold bolts and the studs.
Tighten
• | Tighten the intake manifold bolts and the studs in a first pass
to 10 N·m (89 lb in) in sequence. |
• | Tighten the intake manifold bolts and studs in the second pass
to the final specifications of 50 N·m (37 lb ft)
in sequence. |
- Install the throttle body, gasket, and bolts.
Tighten
Tighten the throttle body bolts to 25 N·m (18 lb ft).
- Install the coolant hoses to the throttle body.
- Install the generator rear brace. Refer to Generator Rear Brace in Engine
Electrical.
- Install the accelerator control/cruise control servo cable adjuster.
- Install the accelerator cable bracket, bolts, and cables.
Tighten
Tighten the accelerator cable bracket bolts to 12 N·m (106 lb in).
- Install the secondary air injection pipe and the nuts.
Tighten
Tighten the secondary air injection pipe exhaust manifold fitting to
55 N·m (41 lb ft).
- Install the EGR valve pipe studs and the nuts.
- Install the EGR valve and the nuts.
Tighten
• | Tighten the EGR valve pipe studs to 6 N·m (53 lb in). |
• | Tighten the EGR valve pipe nuts to 25 N·m (18 lb ft). |
• | Tighten the EGR valve nuts to 25 N·m (18 lb ft). |
• | Tighten the EGR Pipe to exhaust manifold bolt to 30 N·m
(22 lb ft). |
- Install the EGR control valve relay and the nut.
Tighten
Tighten the EGR control valve relay nut to 25 N·m (18 lb ft).
- Install the emission canister purge solenoid and the bracket bolt.
Tighten
Tighten the emission canister purge solenoid bracket bolt to 6 N·m
(53 lb in)
- Install the fuel rail to the intake manifold.
- Install the fuel pressure regulator vacuum tube.
- Install the fuel rail bolts.
Tighten
Tighten the fuel rail bolts to 10 N·m (89 lb in).
- Install the fuel pipe connectors to the fuel rail.
- Install the secondary air injection diverter valve hoses.
- Install the left and the right wiring harnesses.
- Install the wiring harness connectors to the fuel injectors.
- Install the throttle body air duct.
- Install the negative battery cable.
- Refill with coolant. Refer to
Cooling System Draining and Filling
in Engine Cooling.