- Install the positive cable to the harness
conduit.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the positive cable nut (3) at the starter solenoid.
Tighten
Tighten the positive cable nut at the starter solenoid to 10 N·m
(89 lb in).
- Install the positive cable to the generator:
3.1. | Install the positive cable to the stud. |
3.2. | Install the positive cable nut at the generator. |
Tighten
Tighten the positive cable nut at the generator to 10 N·m (89 lb in).
3.3. | Slide the boot over the generator stud. |
- Install the positive cable cover to the cable.
- Install the positive cable to the stud on the fuseblock:
5.1. | Install the positive cable to the stud. |
5.2. | Install the positive cable nut at the fuseblock. |
Tighten
Tighten the positive cable nut at the fuseblock to 14 N·m
(10 lb ft).
5.3. | Close the positive cable cap. |
- Install the battery. Refer to
Battery Replacement
.