Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics Connector End View Reference: Power and Grounding Connector End Views in Wiring Systems | |||
1 | Did you perform the Lighting System Diagnostic System Check? | Go to Step 2 | |
2 |
Does the indicator illuminate? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 | Test for a open or a high resistance in the high beam headlamp supply circuit and the ground circuit to the instrument panel cluster. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 6 | Go to Step 4 |
4 | Inspect for a poor connection at the harness connector of the instrument cluster. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 6 | Go to Step 5 |
5 | Replace the instrument panel cluster. Refer to Instrument Cluster Replacement in Instrument Panel, Gauges and Console. Did you complete the replacement? | Go to Step 6 | -- |
6 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |