Special Tools
- Using
J 24446
(1), install the ball bearing (2) until the bearing
seats.
- Align the retaining ring (1) so that the beveled edge is facing up.
- Install the retaining ring (1).
- Position the transmission case so that the front is facing up.
- Assemble the following tools and install them onto the torque converter housing as shown.
• | J 5959-1 dial indicator (2) |
- Zero the dial indicator (2).
Important: DO NOT pry on the turbine tone wheel when measuring the end play through the power take off access hole.
- Lift the rear of the 1-2-3-4, 4-5-6 clutch housing with a screwdriver through the power take-off (PTO) hole in the transmission case.
- Note the end play measured on the dial indicator.
Specification
The transmission end play must be 0.279-1.549 mm (0.011-0.061 in).
- If the end play is not within the specification, a different selective spacer must be installed.
- Remove the special tools from the transmission.
- Remove the retaining ring and the ball bearing assembly.
- Repeat the measurement and calculation to determine the correct selective spacer.