Removal Procedure
- Remove the left closeout/insulator
pane. Refer to
Instrument Panel Insulator Panel Replacement - Left Side
- Remove the accelerator controls cable (5) from accelerator controls
pedal (1).
- Remove the bolt (3) and stud (2) holding the accelerator controls
pedal to the bulkhead (4).
- Remove the accelerator controls pedal (1) from the bulkhead (4).
Installation Procedure
- Install the accelerator
controls pedal (1) to the bulkhead (4).
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the bolt
(3) and stud (2) holding the accelerator controls pedal to the bulkhead (4).
Tighten
Tighten the stud and bolt to 3 (27 lb in).
- Install the accelerator controls cable (5) to accelerator controls
pedal (1).
Important: The throttle should operate freely without binding between full closed
and wide open throttle.
- Check for complete throttle opening and closing positions by operating
the accelerator controls pedal. Also check for poor carpet fit under the accelerator
controls pedal.
- Install the left closeout/insulator pane. Refer to
Instrument Panel Insulator Panel Replacement - Left Side