Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics Connector End View Reference: Master Electrical Component List in Wiring Systems | |||
1 | Did you perform the Lighting System Diagnostic System Check? | Go to Step 2 | |
2 |
Does the high beam indicator operate properly? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 | Did the high beam headlamps operate properly? | Go to Step 4 | |
4 | Inspect for poor connections at the harness connector of the instrument panel cluster (IPC). Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 6 | Go to Step 5 |
5 | Replace the IPC. Refer to Instrument Cluster Replacement in Instrument Panel, Gages and Console. Did you complete the replacement? | Go to Step 6 | -- |
6 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |