GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


    Object Number: 105527  Size: SH
  1. Remove the fasteners (1) at the rear edge of the insulators in order to disengage from the lower instrument panel.
  2. Push in on the snap tab retainers in order to release.

  3. Object Number: 105529  Size: SH
  4. Disconnect the electrical connector (1).
  5. Turn the heater temperature sensor (3) 1/4 turn in order to release. Leave the sensor connected to its wire.

Installation Procedure


    Object Number: 105529  Size: SH
  1. Connect electrical connector (1).
  2. Install the heater temperature sensor (3) (CJ2 vehicles only).

  3. Object Number: 105527  Size: SH
  4. Set the forward edge of the insulator onto the shelf of the dash mat.
  5. Align the insulator to the floor duct at the HVAC module.
  6. Align the snap tab fasteners to the lower instrument panel and push upward in order to engage.
  7. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  8. Install the fasteners (1).
  9. Tighten
    Tighten the fasteners to 2 N·m (18 lb in).