- Remove the engine from the engine stand.
- Install the flywheel.
- Install NEW flywheel bolts until snug.
- Install the
J 37096
and ratchet to the flywheel to hold the flywheel.
Notice: Refer to Fastener Notice in the Preface section.
- Tighten the flywheel bolts.
Tighten
Tighten the bolts to 15 N·m (11 lb ft) plus an additional 50 degrees using
J 45059
.
- Install the
J 37096
to a ratchet.
- Install the
J 37096
and ratchet to the flywheel to hold the flywheel.
- With the aid of an assistant, install the engine to the vehicle.
- Install the upper transaxle bolts.
Tighten
Tighten the bolts to 75 N·m (55 lb ft).
- Remove the engine lifting device from the lift brackets.
- Unsecure and position the A/C compressor to the engine.
- Install the A/C compressor bolts and nut.
Tighten
Tighten the bolts/nut to 25 N·m (18 lb ft).
- Install the heater inlet (4) and outlet (2) adapters to the drive belt tensioner.
(heater hoses shown removed for clarity).
- Install the heater inlet and outlet hose adapter bolts (1, 3).
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Install the radiator outlet hose to the front cover.
- Using
J 38185
position the radiator outlet hose clamp at the front cover.
- Install the radiator inlet hose to the thermostat housing.
- Using
J 38185
position the radiator inlet hose clamp at the thermostat housing.
- Position the engine wiring harness over the engine.
- Connect the engine harness electrical connector (3) to the MAP sensor.
- Connect the engine harness electrical connector (1) to the ignition control module harness electrical connector (2).
- Install the engine harness retainers (2) to the fuel rail.
- Connect the engine harness electrical connectors (1) to the front fuel injectors.
- Connect the engine harness electrical connector (2) to the EGR valve.
- Connect the engine harness clips (1, 3) to the heat shield.
- Connect the engine harness electrical connector (2) to the ECT sensor.
- Connect the engine harness electrical connector (1) to the throttle actuator.
- Connect the engine harness electrical connector to the generator.
- Connect the engine harness electrical connector to the rear HO2S.
- Install the engine harness electrical connector retainers (2) to the fuel rail.
- Connect the engine harness electrical connectors (1) to the rear fuel injectors.
- Position the power steering pump and install the power steering pump bolts. (pulley shown removed for clarity).
Tighten
Tighten the bolts to 34 N·m (25 lb ft).
- Install the brake booster vacuum hose to the intake manifold.
- Install the fan shroud. Refer to
Fan Shroud Replacement
.
- Install the engine mount strut. Refer to
Engine Mount Strut Replacement
.
- Install the water pump pulley and bolts until snug.
- Install the drive belt. Refer to
Drive Belt Replacement
.
- Tighten the water pump pulley bolts.
Tighten
Tighten the bolts to 13 N·m (115 lb in).
- Connect the EVAP line (2) quick connect fitting to the purge solenoid. Refer to
Plastic Collar Quick Connect Fitting Service
.
- Connect the fuel feed line (1) quick connect fitting to the fuel rail. Refer to
Metal Collar Quick Connect Fitting Service
.
- Install the starter cable to the generator.
- Install the generator terminal nut.
Tighten
Tighten the nut to 20 N·m (15 lb ft).
- Position the starter cable boot.
- Install the air cleaner assembly. Refer to
Air Cleaner Assembly Replacement
.
- Raise the vehicle.
- Install the lower front transaxle bolt.
Tighten
Tighten the bolt to 75 N·m (55 lb ft).
- Install the lower rear transaxle bolt.
Tighten
Tighten the bolt to 75 N·m (55 lb ft).
- Position the oil filter adapter gasket and adapter.
- Install the oil filter adapter bolts.
Tighten
Tighten the bolts to 50 N·m (37 lb ft) plus an additional 3 degrees using
J 45059
.
- Install the right wheel drive shaft. Refer to
Wheel Drive Shaft Replacement
.
- Position the starter cable terminal (2) to the engine and install the starter cable ground bolt (5).
Tighten
Tighten the bolt to 25 N·m (18 lb ft).
- Connect the engine harness electrical connector (7) to the A/C compressor.
- Connect the engine harness electrical connector (5) to the A/C pressure sensor.
- Install the engine harness (3) terminal to the starter.
- Install the starter solenoid "S" terminal nut (4).
Tighten
Tighten the nut to 2.3 N·m (20.5 lb in).
- Connect the engine harness electrical connector to the rear knock sensor jumper
harness.
- Install the engine harness clip (4) to the steering gear bracket.
- Install the engine harness clip (1) to the engine bracket.
- Connect the engine harness electrical connector (3) to the VSS.
- Connect the engine harness electrical connector (2) to the oil pressure sensor.
- Install the exhaust manifold to catalytic converter nuts.
Tighten
Tighten the nut to 30 N·m (22 lb ft).
- Install the rear engine mount to frame nut.
Tighten
Tighten the nut to 80 N·m (59 lb ft).
- Install the front engine mount to frame nut.
Tighten
Tighten the nut to 80 N·m (59 lb ft).
- Position the transaxle brace to the engine and install the bolts to the engine and oil pan.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the transaxle brace to transaxle bolts (1).
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Align the mark on the torque converter to the mark on the flywheel.
- Install the torque converter bolts. (engine shown removed for clarity).
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the starter motor. Refer to
Starter Motor Replacement
.
- Position the rear transaxle converter cover (4).
- Install the rear transaxle converter cover bolts (3).
Tighten
Tighten the bolts to 7.5 N·m (66 lb in).
- Position the front transaxle converter cover (2).
- Install the front transaxle converter cover bolt (1).
Tighten
Tighten the bolt to 7.5 N·m (66 lb in).
- Position the transaxle brace and install the brace to oil pan bolts.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the transaxle brace to transaxle bolts.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Lower the vehicle.
- Remove the oil fill tube from the valve rocker cover.
- Insert the tab on the rear of the intake manifold cover through the engine bracket.
- Align the hole in the intake manifold cover with the oil fill tube hole in the valve rocker cover.
- Insert the oil fill tube into the valve rocker cover and twist clockwise in order to lock the detent on the tube into the notch in the cover.
- Install the hood. Refer to
Hood Replacement
.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Fill the crankcase with oil. Refer to
Engine Oil and Oil Filter Replacement
.
- Fill the cooling system. Refer to
Cooling System Draining and Filling
.
- Perform the CKP system variation learn procedure. Refer to
Crankshaft Position System Variation Learn
.
- Start the vehicle and inspect for leaks.