GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


Object Number: 1566742  Size: SH

The front of the dash panel is formed from laminated steel. This steel is constructed by bonding 2 pieces of cold rolled steel (1) with a viscoelastic layer of adhesive (2). Metal inert gas (MIG) welding laminated steel does not meet GM Corporate standards for structural integrity. As an alternative, all factory welds will be replaced by using the rivet and adhesive bond method described in the installation portion of this procedure. The rivet and adhesive bond method must only be used in the areas as described in this procedure.

Important: Failure to follow this procedure will compromise the structural integrity of the vehicle.

    Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.

    Caution: Refer to Foam Sound Deadeners Caution in the Preface section.


    Object Number: 1566749  Size: SH
  1. Disable the SIR system. Refer to SIR Disabling and Enabling .
  2. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  3. Caution: Sectioning should be performed only in the recommended areas. Failure to do so may compromise the structural integrity of the vehicle and cause personal injury if the vehicle is in a collision.

  4. Remove all related panels and components.
  5. Repair as much of the damage as possible.
  6. Remove the sealers and the anti-corrosion materials from the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair .
  7. Important: Note the number and location of the factory welds for installation of the full rail service part.

  8. Remove the front wheelhouse assembly. Refer to Front Wheelhouse Replacement .

  9. Object Number: 1566752  Size: SH

    Important: Drill through the rail flange only. Do NOT drill into the dash panel or the inner reinforcements.

  10. Using an 7-mm (17/64-in) spot weld remover, locate and drill out the factory welds on the weld flange connecting the lower rail to the dash panel.

  11. Object Number: 1566778  Size: SH
  12. Using an 8-mm (5/16-in) spot weld remover, locate and drill out the factory welds on the weld flange connecting the lower rail to the inner hinge pillar.

  13. Object Number: 1566756  Size: SH
  14. From the passenger compartment, locate the remaining factory welds which join the floor, the front of the dash, and the frame rail. Using an 8-mm (5/16-in) spot weld remover, drill out these welds.

  15. Object Number: 1566760  Size: SH

    Important: Do NOT remove the rail inner reinforcement from the vehicle.

  16. Locate and drill out the factory welds between the rail inner reinforcement and the rail. Drill through the reinforcement only. Do NOT drill through the rail and the floor.

  17. Object Number: 1566761  Size: SH
  18. Locate and drill out the remaining factory welds on the rail.

  19. Object Number: 1566762  Size: SH
  20. Separate the floor pan reinforcement vertical flanges from the inside of the lower rails. Do NOT damage the flanges.
  21. Important: Note that the flanges overlap the rails.

  22. Drill out the factory welds along the lower flanges on the floor pan reinforcement. Use an 8-mm (5/16-in) drill bit.
  23. Turn the lower flanges down at an angle away from the rail.
  24. Drill out the remaining factory welds on the rail. Drill out and remove the lower portion of the rail at the wheelhouse.
  25. With a flat chisel, loosen the adhesive between the floor pan and the lower rail by prying the rail away from the floor. Do NOT damage the floor.

  26. Object Number: 1566764  Size: SH
  27. Remove the full rail.
  28. Turn the vertical flange forward to be welded to the new rail.

Installation Procedure

  1. Position the service rail to the vehicle using three-dimensional measuring equipment.
  2. Clamp the rail in place.

  3. Object Number: 1566765  Size: SH
  4. Using a 7-mm (17/64-in) bit, drill the rivet attachment holes through the service rail and the dash panel in the exact locations as noted from the factory rail.

  5. Object Number: 1566766  Size: SH
  6. From the passenger compartment side of the vehicle, using a 7-mm (17/64-in) bit, drill the rivet attachment hole through the service rail using the existing 8-mm (5/16-in) holes in the dash panel as alignment marks.
  7. Remove the service rail.
  8. Important: If the location of the original plug weld holes cannot be determined, space the plug weld holes every 40 mm (1.5 in) apart.

  9. Drill 8-mm (5/16-in) plug weld holes in the service rail, as necessary, in the remaining locations noted from the original rail.
  10. Prepare the plug weld mating surfaces, as necessary.
  11. Apply GM-approved Weld-Thru Coating or equivalent to all mating surfaces. Refer to Anti-Corrosion Treatment and Repair .

  12. Object Number: 1566767  Size: SH
  13. Prepare the bond mating areas by grinding the body mating and the service part flanges to bare steel. Do NOT damage the corners or thin the metal during the grinding process.
  14. Clean the mating surfaces.

  15. Object Number: 1566769  Size: SH

    Important: The adhesive has a 40-50 minute working time. Do NOT allow the adhesive to cure prior to installing the service rail.

  16. Apply a 3-6 mm (1/8 to 1/4 in) bead of metal panel bonding adhesive GM P/N 12378567 (Canadian P/N 88901675) or equivalent to both of the mating surfaces.

  17. Object Number: 1566770  Size: SH
  18. Using a small acid brush, spread a coat of adhesive to both of the mating surfaces. Cover all of the bare metal to ensure corrosion protection.

  19. Object Number: 1566771  Size: SH
  20. Apply a 3-6 mm (1/8 to 1/4 in) bead of metal panel bonding adhesive GM P/N 12378567 (Canadian P/N 88901675) or equivalent to the mating surface of the service rail.

  21. Object Number: 1566772  Size: SH

    Important: Do NOT pull the rail off of the dash after adhesion. To align the parts, slide the rail against the front of the dash.

  22. Position the service rail to the vehicle using 3-dimensional measuring equipment.
  23. Clamp the rail in place.

  24. Object Number: 1566773  Size: SH

    Important: Verify proper positioning of the service rail prior to riveting and welding.

  25. Install the rivets so that the rivet head contacts the passenger compartment side of the dash.

  26. Object Number: 1566774  Size: SH
  27. Install the rivets so that the rivet head contacts the rail.
  28. Remove the excess adhesive from the rail area.
  29. Plug weld the remaining holes accordingly.
  30. Clean and prepare all of the welded surfaces.
  31. Install the front wheelhouse assembly. Refer to Front Wheelhouse Replacement .
  32. Apply the sealers and anti-corrosion materials to the repaired area, as necessary. Refer to Anti-Corrosion Treatment and Repair .
  33. Paint the repaired area. Refer to Basecoat/Clearcoat Paint Systems .
  34. Install all of the related panels and components.
  35. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  36. Enable the SIR system. Refer to SIR Disabling and Enabling .