Step | Action | Value(s) | Yes | No | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Did you perform the Power Sunroof System Check ? | -- | Go to Step 2 | |||||||||
2 | Check the SUNRF fuse in the rear fuse block by visual inspection. Is the fuse open? | -- | Go to Step 3 | Go to Step 4 | ||||||||
3 | Repair the short to ground in CKT 343 (YEL). Is the circuit repair complete? | -- | Go to Step 21 | -- | ||||||||
4 |
Is the voltage within the specified range? | 10-15 V | Go to Step 5 | Go to Step 10 | ||||||||
5 | Connect a DMM across connector C1 terminals C and D. Is the voltage within the specified range? | 10-15 V | Go to Step 6 | Go to Step 11 | ||||||||
6 |
Is the measured resistance equal to the specified value? | Infinite (OL) | Go to Step 7 | Go to Step 18 | ||||||||
7 |
Is the measured resistance in the specified range when the switch is pressed forward and when the switch is pressed backwards? | 0-5ohms | Go to Step 8 | Go to Step 12 | ||||||||
8 |
Is the resistance within the specified value? | 0-5ohms | Go to Step 9 | Go to Step 12 | ||||||||
9 |
Is the voltage within the specified limits for each switch position? | 10-15 V | Go to Step 18 | Go to Step 15 | ||||||||
10 | Repair the open in CKT 343 (YEL). Is the repair complete? | -- | Go to Step 21 | -- | ||||||||
11 | Repair the open in CKT 650 (BLK). Is the repair complete? | -- | Go to Step 21 | -- | ||||||||
12 | Check CKT 100 (BRN), CKT 128 (WHT) and CKT 144 (DK BLU) for an open or short to ground. Are the circuits OK? | -- | Go to Step 14 | Go to Step 13 | ||||||||
13 | Repair open or short to ground in CKT 100 (BRN), CKT 128 (WHT) and CKT 144 (DK BLU). Is the repair complete? | -- | Go to Step 21 | -- | ||||||||
14 | Replace the sunroof switch. Refer to Sunroof Switch Replacement . Is the repair complete? | -- | Go to Step 21 | Go to Step 15 | ||||||||
15 | Check CKT 127 (DK GRN ) and CKT 129 (LT GRN) for an open, short to ground or short to battery positive voltage (B+). Are the circuits OK? | -- | Go to Step 21 | Go to Step 16 | ||||||||
16 | Repair CKT 127 (DK GRN) or CKT 129 (LT GRN). Is the repair complete? | -- | Go to Step 21 | Go to Step 17 | ||||||||
17 | Replace the sunroof control module. Refer to Power Sunroof Express Module Replacement . Is the repair complete? | -- | Go to Step 21 | Go to Step 18 | ||||||||
18 | Check CKT 132 (RED) and CKT 133(YEL) for an open, short to ground or short to. Are the circuits OK? | -- | Go to Step 21 | Go to Step 19 | ||||||||
19 | Repair CKT 132 (RED) or CKT 133 (YEL). Is the repair complete? | -- | Go to Step 21 | Go to Step 20 | ||||||||
20 | Replace the sunroof actuator. Refer to Power Sunroof Motor Replacement . Is the repair complete? | -- | Go to Step 21 | -- | ||||||||
21 |
Is the system check complete? | -- | System OK | -- |