Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics Connector End View Reference: Master Electrical Component List in Wiring Systems | |||
1 | Did you perform the Lighting Systems Diagnostic System Check? | Go to Step 2 | |
2 |
Important:: Vehicle shift lever must be out of the PARK position and the parking brake disengaged in order for the daytime running lamps (DRL) to operate.
Did the DRL operate properly? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 | Do the high beam headlamps operate properly? | Go to Step 4 | |
4 | Does the twilight sentinel operate properly? | Go to Step 5 | |
5 | Test for an open circuit in the park/neutral position switch park signal circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 8 | Go to Step 6 |
6 | Inspect for poor connections at the harness connector of the LCM. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 8 | Go to Step 7 |
7 | Replace the LCM. Refer to Lamp Control Module Replacement . Did you complete the replacement? | Go to Step 8 | -- |
8 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |