The Class 2 serial data circuit to the DLC allows bi-directional communication between the PCM and the scan tool. If communication between the scan tool and the PCM cannot be established, the procedure in the DLC Diagnosis table should be used to diagnose the condition.
Check the following items:
• | For the PCM to establish communication with the scan tool, system voltage must be between 9.0 and 16.0 volts. If system voltage is not within this range, refer to Charging System for diagnosis. |
• | Ensure that the correct application (model year, carline, VIN code) has been selected on the scan tool; if communication still cannot be established try the scan tool on another vehicle to ensure that the scan tool or cables are not the cause of the condition. |
• | An intermittent may be caused by a poor connection, rubbed through wire insulation or a wire broken inside the insulation. Check for poor connections or a damaged harness. Inspect the PCM harness and connectors for improper mating, broken locks, improperly formed or damaged terminals, poor terminal to wire connection, and damaged harness. |
Number(s) below refer to the step number(s) on the Diagnostic Table:
Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Powertrain On-Board Diagnostic (OBD) System Check performed? | -- | ||
2 |
Is the test light ON? | -- | ||
3 | Probe both of the DLC ground circuits (cavities 4 and 5) with a test light to B+. Is the test light ON at both ground circuits? | -- | ||
4 | Probe the Class 2 serial data circuit at the DLC with a J 39200 Digital Multimeter to ground. Is the voltage near the specified value? | 0 V | ||
5 |
Is the test light ON? | -- | ||
6 |
Was a problem found? | -- | ||
7 |
Was a problem found? | -- | ||
8 | Locate and repair the short to ground in the Class 2 serial data circuit. Refer to Data Link Connector in Electrical Diagnosis. Is action complete? | -- | -- | |
9 | Locate and repair the open in the affected DLC ground circuit. Refer to Repair Procedures in Electrical Diagnosis. Is action complete? | -- | -- | |
10 | Locate and repair the open or short to ground in the DLC battery positive voltage circuit. Refer to Repair Procedures in Electrical Diagnosis. Is action complete? | -- | -- | |
Replace the PCM. Important:: Replacement PCM must be programmed. Refer to Powertrain Control Module Replacement/Programming . Is action complete? | -- | -- |