Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Instrument Panel Tie Bar Assembly Fastener (Qty: 10) Caution: Refer to Fastener Caution in the Preface section. Tighten |
2 | Heater and Air Conditioning Evaporator and Blower Module Fastener (Qty: 3) ProcedureRelease the Heater and Air Conditioning Evaporator and Blower Module from the I/P Tie Bar and secure the module at the Body. Tighten |
3 | Instrument Panel Tie Bar Assembly Procedures
|