Removal Procedure
- Remove the right IP insulator. Refer to
Instrument Panel Insulator Replacement
in Instrument Panel
Gauges and Console.
- Disconnect the two stage
orifice relay push in retainer (1) from the cross vehicle beam.
- Disconnect the electrical connector (2).
- Remove the two stage orifice relay.
Installation Procedure
- Install the two stage orifice relay.
- Connect the electrical
connector (2).
- Install the two stage orifice relay (1) to the cross vehicle beam.
- Install the right IP insulator. Refer to
Instrument Panel Insulator Replacement
in Instrument Panel
Gauges and Console.