Removal Procedure
Important: If the damage exceeds the recommended area for sectioning and the rail
cannot be straightened, the complete rail must be replaced.
Sectioning procedures have been developed to simplify repair of the
lower rails, providing the majority of the damage can be returned to factory
specifications. This allows the damaged front section to be replaced without
performing a full rail replacement. The rails come as a complete assembly.
The front portion of the rail and bumper brackets are also serviced separately.
Important: Failure to follow the instructions included with the service rail may
lead to improper rail sectioning, which may compromise the structural integrity
of the vehicle.
- On top of the rail, locate the cut-out square (1). From the top
edge of the square, measure forward 25 mm (1 in) and scribe
a line.
- Add 10 mm (13/32 in) and scribe a second line. The
second line 35 mm (1 3/8 in) is the cut location. The additional
10 mm (13/32 in) will be used to create a flange for welding
the new service part to the vehicle.
- On the outboard side of
the rail, locate the brake line pass-thru hole (1). At the larger
hole, pull the tape measure from the forward edge of the hole and mark a
line at 392 mm (15 7/16 in). Scribe a line with a straight
edge, making sure it is square to inboard and top rail markings.
- Locate hole (1),
on the inboard side of the rail. Measure forward 140 mm (5 1/2 in)
and mark the location. Scribe a straight line on the rail.
- Measure forward 10 mm (13/32 in) and scribe a second
line. The second line 150 mm (5 29/32 in) is the cut
location (2).
- Cut through three sides
of the rail.
- On the bottom of the damaged rail, scribe a line from the outboard
to the inboard cut locations and cut the remainder of the rail (1)
from the vehicle.
- Remove the damaged section of the rail.
Installation Procedure
- On the original rail,
cut and remove 10 mm (13/32 in) of the outboard (1)
and downward (2) turned flanges of the rail. Cut 10 mm (13/32 in)
gaps along the corners of the original rail (3).
- Step the top, bottom, and side tabs inward (4) to allow
the service part to fit over the original rail.
- Clean and prepare mating surfaces as necessary.
- Position the service part (1)
over the original rail. Align and check fit using three-dimensional measuring
equipment.
- Stitch weld along the
entire sectioning joint. Make 25 mm (1 in) welds along the seam
with 25 mm (1 in) gaps between them.
- Go back and complete the stitch weld. This will create a solid
weld joint with minimal heat distortion.
- Clean and prepare all welded surfaces.
Important: Prior to refinishing, refer to publication GM 4901M-D-01 GM Approved
Refinish Materials for recommended products. Do not combine paint systems.
Refer to paint manufacturer's recommendations.
- Prime with a two-part catalyzed primer.
- Apply sealers and anti-corrosion materials as necessary.
- Install all related panels and components.