The listed Serviceman Bulletins require the following corrections. Please update your bulletins to include these changes.
Service Bulletin Correction ---------------- ----------
Bulletin No: T-86-76 T-86-76 File in Group: 8 8 Number: 41 42 Date: Aug.'86 Aug.'86
Bulletin No: T-86-82 T-96-82 File In Group: 8 8 Number: 42 43 Date: Aug. '86 Aug. '86
Bulletin No: T-87-7 Labor Operation E7010 at File In Group: 8 .3 hours should be changed Number: 45 to operation R1275 at Date: Sept. '86 .3 hours.
Bulletin No: T-87-16 Time Allowance for cooler File In Group: 7 flushing procedure will be Number: 143 included in specific 1986 Date: Sept. '86 and 1987 Labor Time Guide operations. When using a 1985 and prior Time Guide, add 0.6 hours for cooler flushing to the recondition or SRTA replacement time allowance.
General Motors bulletins are intended for use by professional technicians, not a "do-it-yourselfer". They are written to inform those technicians of conditions that may occur on some vehicles, or to provide information that could assist in the proper service of a vehicle. Properly trained technicians have the equipment, tools, safety instructions and know-how to do a job properly and safely. If a condition is described, do not assume that the bulletin applies to your vehicle, or that your vehicle will have that condition. See a General Motors dealer servicing your brand of General Motors vehicle for information on whether your vehicle may benefit from the information.