Subject: | Revised HVAC Blower Motor Installation Procedures |
Models: | 1994-1997 Cadillac Seville |
| 1994-1999 Cadillac
DeVille |
| 1994-2002 Cadillac Eldorado |
The intent of this bulletin is to provide technicians information regarding
the proper installation of the Heating, Ventilation and Air Conditioning (HVAC) Module
blower motor (with impeller) assembly.
The current available HVAC Module blower motor for the above listed vehicles
can be identified by the three mounting holes (1). The original equipment blower motor
had five mounting holes.
In order to avoid confusion and ensure a high level of customer satisfaction,
when replacing an HVAC Module blower motor, refer to this bulletin for the appropriate
procedure.
DeVille-HVAC Blower Motor
Caution: Before servicing any electrical component, the
ignition key must be in the OFF or LOCK position and all electrical loads must be
OFF, unless instructed otherwise in these procedures. If a tool or equipment could
easily come in contact with a live exposed electrical terminal, also disconnect the
negative battery cable. Failure to follow these precautions may cause personal injury
and/or damage to the vehicle or its components.
Removal Procedure
- Disconnect the negative battery cable.
- Remove the cross-car brace. Refer to Brace Replacement-Cross Vehicle in
the Body Front End sub-section of the Service Manual or SI document #369605.
- Disconnect and position the ignition control module assembly out of the
way. Refer to Ignition Control Module Replacement in the Engine Controls sub-section
of the Service Manual or SI document #189202.
- Position the cross-car harness out of the way.
- Remove the solenoid purge valve. Refer to Evaporative Emission (EVAP)
Canister Purge Solenoid Valve Replacement in the Engine Controls Sub-section of the
Service Manual or SI document #411822.
- Remove the blower motor.
• | Disconnect connector from the blower motor. |
• | Remove the blower motor screws (either 3 or 5 screws). |
• | Remove the blower motor from the HVAC Module. |
Installation Procedure
- If present, remove the 2 ribs located on the barrier. Refer to Step 3
and the illustrations in the Instruction Sheet, P/N 52494110, found in the blower
motor kit.
Important: Ensure the blower motor gasket makes a complete
seal around the blower motor.
- Install the new blower motor with heat shield. Refer to Steps 4 and 5 in the
Instruction Sheet, P/N 52494110, found in the blower motor kit.
- Install the blower motor retaining screws.
Tighten
Tighten the screws to 4N·m(35 lb in).
- Tighten the lower heat shield retaining screws to 4N·m(35 lb in).
- Connect the connector to the blower motor.
- Install the solenoid purge valve. Refer to Evaporative Emission (EVAP)
Canister Purge Solenoid Valve Replacement in the Engine Controls Sub-section of the
Service Manual or SI document #411822.
- Reposition and connect the ignition control module assembly. Refer to
Ignition Control Module Replacement in the Engine Controls sub-section of the Service
Manual or SI document #189202.
- Install the cross-car brace. Refer to Brace Replacement-Cross Vehicle
in the Body Front End sub-section of the Service Manual or SI document #369605.
- Connect the negative battery cable.
Eldorado/Seville-HVAC Blower Motor
Caution: Before servicing any electrical component, the
ignition key must be in the OFF or LOCK position and all electrical loads must be
OFF, unless instructed otherwise in these procedures. If a tool or equipment could
easily come in contact with a live exposed electrical terminal, also disconnect the
negative battery cable. Failure to follow these precautions may cause personal injury
and/or damage to the vehicle or its components.
Removal Procedure
- Disconnect the negative battery cable.
- Remove the camshaft cover. Refer to Camshaft Cover Replacement-Right in
the Engine Mechanical sub-section of the Service Manual or SI document #777623.
- Remove the blower motor.
• | Disconnect connector from the blower motor. |
• | Remove the blower motor screws (either 3 or 5 screws). |
• | Remove the blower motor from the HVAC Module. |
Installation Procedure
- If present, remove the 2 ribs located on the barrier. Refer to Step 3
and the illustrations in the Instruction Sheet, P/N 52494110, found in the blower
motor kit.
Important: Ensure the blower motor gasket makes a complete
seal around the blower motor.
- Install the new blower motor with heat shield. Refer to Steps 4 and 5 in the
Instruction Sheet, P/N 52494110, found in the blower motor kit.
- Install the blower motor retaining screws.
Tighten
Tighten the screws to 4N·m(35 lb in).
- Tighten the lower heat shield retaining screws to 4N·m(35 lb in).
- Connect the connector to the blower motor.
- Install the camshaft cover. Refer to Camshaft Cover Replacement-Right
in the Engine Mechanical sub-section of the Service Manual or SI document #777623.
- Connect the negative battery cable.