Removal Procedure
- Raise the vehicle. Refer
to
Lifting and Jacking the Vehicle
in General Information.
- Remove the bank 2 intermediate pipe/hose (1) from the AIR pump
(2).
- Lower the vehicle.
- Loosen the pinch clamp connecting the bank 2 intermediate pipe/hose
(1) to the bank 2 shut-off valve.
- Remove the bank 2 intermediate pipe/hose (1).
Installation Procedure
- Install the bank 2 intermediate
pipe/hose (1).
- Install the pinch clamp connecting the bank 2 intermediate pipe/hose
(1) to the bank 2 shut-off valve.
- Raise the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Install the bank 2 intermediate pipe/hose (1) and clamp to the
AIR pump (2).
- Lower the vehicle.