Removal Procedure
Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
- Disable the SIR system. Refer to
SIR Disabling and Enabling
in SIR.
- Disconnect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine Electrical.
Important: Perform full replacement only when a full
frame rail assembly is installed. Use overlap procedure for rail sectioning.
Important: The rear floor pan service part comes pre-cut
to the correct length for replacement . The part does not need to be modified.
- Remove all related panels and components.
- Remove the sealers and anti-corrosion materials from the repair area,
as necessary. Refer to
Anti-Corrosion Treatment and Repair
in Paint and Coatings.
- Visually inspect and repair as much of the damage as possible.
Important: Do not damage any inner reinforcements or
panels. Use caution not to damage the welds that attach the frame rail to the wheelhouse
if you are not replacing the complete rail assembly.
- Cut the rear compartment panel at the rear
edge of the number 5 crossbar.
- Locate, mark, and drill out all factory welds. Note the number and location
of welds for installation of the service assembly.
- Remove the damaged rear compartment panel
from the vehicle.
Installation Procedure
Important: This part has structural weld-thru adhesive
in the joint areas. Replace this part with additional spot welds at the attachment
points. This can be accomplished by adding an additional weld between each factory
weld.
- Prepare the mating surfaces as necessary.
- Drill 8 mm (5/16 in) plug weld holes along the front edge
of the service part. Locate these holes 13 mm (½ in) from the
edge of the service part spaced 40 mm (1½ in) apart.
- Drill 8 mm (5/16 in ) plug weld holes in the service part,
as necessary, in the locations noted from the original panel . Do not drill holes
in the vertical flange along the wheelhouse area . This area will be bonded.
- Apply 3M Weld-Thru Coating P/N 05913 or equivalent to all mating
surfaces.
- Apply bonding material Lord 108 to the vertical flanges in the
wheelhouse areas only.
- Install and align the service part using 3-dimensional measuring
equipment.
- Plug weld accordingly.
- To create a solid weld along the front of
the service part with a minimum of heat distortion , make a 25 mm (1 in)
stitch weld along the seam with 25 mm (1 in) gaps between them. Then
go back and complete the weld.
- Clean and prepare all welded surfaces.
- Paint the repaired area. Refer to
Basecoat/Clearcoat Paint Systems
in Paint and Coatings.
- Apply the sealers and anti-corrosion materials to the repair area, as
necessary. Refer to
Anti-Corrosion Treatment and Repair
in Paint and Coatings.
- Install all related panels and components.
- Connect the battery ground (negative) cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine Electrical.
- Enable the SIR system. Refer to
SIR Disabling and Enabling
in SIR.