Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.
Important: Sectioning of the front upper rails is not recommended.
Important: If the location of the original plug weld holes can not be determined, or if structural weld-thru adhesive is present, space the plug weld holes every 40 mm (1½ in).