Removal Procedure
- Remove the center console. Refer to
Front Floor Console Replacement
.
- Remove the rubber adhesive patch (1) from around the drain tube (2).
- Open the flap in the tunnel insulator and unsnap drain fitting from the
tunnel sheet metal.
- Remove the HVAC module drain tube from the HVAC module.
Installation Procedure
- Install the HVAC module drain tube to the HVAC module.
- Ensure that the drain tube is fully seated to the HVAC module.
- Snap drain fitting into the tunnel sheet metal.
- Close the flap on the tunnel insulator.
- Install the rubber adhesive patch (1) around the drain tube (2).
- Install the center console. Refer to
Front Floor Console Replacement .