Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics | |||
1 | Did you perform the Lighting Systems Diagnostic System Check? | Go to Step 2 | |
2 |
Do the high beam headlamps remain illuminated? | Go to Step 3 | |
3 | Does the high beam indicator remain illuminated? | Go to Step 4 | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems |
4 | Inspect for poor connections at the harness connector of the Instrument Cluster (IPC). Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 6 | Go to Step 5 |
5 | Replace the Instrument Cluster (IPC). Refer to Instrument Cluster Replacement in Instrument Panel, Gages and Console. Did you complete the repair? | Go to Step 6 | -- |
6 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |