Removal Procedure
- Disconnect the battery negative cable. Refer to
Battery Negative Cable Disconnection and Connection
.
- Remove the intake manifold. Refer to
Intake Manifold Replacement
in Engine Mechanical - 4.6L (LH2).
- Disconnect
the BAT cable (2) from the starter.
- Disconnect the wire from the "S" terminal (4) on the
starter.
- Remove the 2 starter motor mounting
bolts.
- Remove the starter motor.
Installation Procedure
- Install
the starter motor.
Notice: Refer to Fastener Notice in the Preface section.
- Install the starter motor mounting bolts.
Tighten
Tighten the starter motor mounting bolts to 30 N·m (22 lb ft).
- Connect the starter motor "S" terminal wire (4).
Tighten
Tighten the starter solenoid S terminal nut to 4 N·m (35 lb in).
- Connect the starter motor BAT terminal wire (2).
Tighten
Tighten the battery cable to starter terminal nut to 10 N·m (89 lb in).
- Install the intake manifold. Refer to
Intake Manifold Replacement
in Engine Mechanical - 4.6L
(LH2).
- Connect the battery negative cable. Refer to
Battery Negative Cable Disconnection and Connection
.