• | EN 46109 Guide Pins |
• | J 39946 Crankshaft Socket - 4.0L and 4.6L |
• | J 45059 Angle Meter |
For equivalent regional tools, refer to Special Tools.
Note: Ensure components being sealed with RTV are assembled within 20 minutes. Components assembled after the RTV has skinned-over, approximately 20 minutes, will not seal properly.
Note: Ensure components being sealed with RTV are assembled within 20 minutes. Components assembled after the RTV has skinned-over, approximately 20 minutes, will not seal properly.
Note: DO NOT apply sealant to the inner seal of the oil distribution plate.
Caution: Refer to Fastener Caution in the Preface section.
20.1. | Tighten the main bearing bolts (1-20) to 20 N·m (15 lb ft ) in the proper sequence. |
20.2. | Tighten the main bearing bolts (1-20) an additional 65 degrees in the proper sequence using the J 45059 meter . |