Caution: Refer to Battery Disconnect Caution in the Preface section.
Important: Do not use a tool to pry the EBCM or the BPMV. Excessive force will damage the EBCM.
Important: Do not reuse the transfer tubes. Always install new transfer tubes.
Important: Do not use RTV or any other type of sealant on the EBCM gasket or mating surfaces.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the four T-25 TORX® screws to 5 N·m (39 lb in)
in an X-pattern.
Tighten
Tighten three 13 mm bolts to 9 N·m (7 lb ft).
Tighten
Tighten the brake pipe fitting to 24 N·m (18 lb ft).
Tighten
Tighten the three hydraulic lines to 30 N·m (22 lb ft).
Tighten
Tighten two 13 mm weld/stud nuts to 24 N·m (18 lb ft).
Important: Verify that the combination valve metering rod is not depressed during bleeding.