Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Backup Lights System Check? | -- | Go to Step 2 | Go to Backup Lamp System Check |
2 |
Does the test lamp light? | -- | Go to Step 3 | Go to Step 5 |
3 | Inspect the condition of the lamp socket. Is the lamp socket in proper condition? | -- | Go to Step 4 | Go to Step 6 |
4 | Repair the open in CKT 1350 (BLK) or CKT 1450 (BLK) between the inoperative left side or right side backup lamp and ground G400 or ground G401 respectively. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |
5 | Repair the open in CKT 24 (LT GRN) between the inoperative lamp and splice S321. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |
6 | Replace the lamp socket. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |
Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Does the test lamp light? | -- | Go to Step 2 | Go to Step 3 |
2 | Check condition of socket. If OK, locate and repair open in BLK (550) wire between inoperative lamp and S411. Is repair complete? | -- | Go to Backup Lamp System Check | -- |
3 | Locate and repair open in LT GRN (24) wire between inoperative lamp and S410. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |