Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you review the Starting and Charging operation and perform the necessary inspections? | -- | Go to Step 2 | |
2 |
Is the voltage reading within specification? | 13.0 - 16.0 V | Go to Step 4 | Go to Step 3 |
3 | Inspect the generator. Refer to Diagnostic System Check - Engine Electrical . Does the generator operate properly? | -- | Go to Step 10 | |
4 | Compare the voltage reading at the battery to the voltage reading on the gauge in the instrument cluster. Are the two readings within 1 volt? | -- | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 5 |
5 |
Is the reading within 1 volt of the reading at the battery? | -- | Go to Step 6 | Go to Step 7 |
6 | Replace the instrument cluster. Refer to Instrument Cluster Replacement in Instrument Panel, Gauges, and Console. Did you complete the replacement? | -- | Go to Step 11 | -- |
7 | Measure for continuity from CKT 550 (BLK) cavity B4 to ground. Is there continuity? | -- | Go to Step 9 | Go to Step 8 |
8 | Repair CKT 550 (BLK) wire. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | -- | Go to Step 11 | -- |
9 | Repair CKT 39 (PNK) wire. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | -- | Go to Step 11 | -- |
10 | Replace the Generator. Refer to Generator Replacement . Did you complete the replacement? | -- | Go to Step 11 | -- |
11 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | Go to Step 2 |