Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Charging System Check performed? | -- | Go to Charging System Check | |
2 |
Does the battery indicator light? | -- | ||
3 |
Is the voltage reading the same as battery voltage? | -- | ||
4 | Repair the open in CKT 39 (PNK) between the IP fuse block and the instrument cluster. Is the repair complete? | -- | Go to Charging System Check | -- |
5 | Repair or replace the generator. Refer to Generator Replacement . Is the repair or replacement complete? | -- | Go to Charging System Check | -- |
6 |
Does the battery indicator light? | -- | ||
7 | Replace the instrument cluster. Refer to Instrument Cluster Replacement in Instrument Panel, Gauges and Console. Is the repair complete? | -- | Go to Charging System Check | -- |
8 | Repair the open in CKT 25 (BRN) between the instrument cluster and the generator. Is the repair complete? | -- | Go to Charging System Check | -- |