Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Exterior Lights Schematics | |||
1 | Did you review the Exterior Lighting Systems Description and Operation and perform the necessary inspections? | Go to Step 2 | |
2 | Verify that the park lamps are inoperative. Do the park lamps operate normally? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 | Are the turn signals lamps and marker, license and tail lamps operating properly? | Go to Step 4 | |
4 |
Does the inoperative lamp have an open filament or terminal? | Go to Step 7 | Go to Step 6 |
6 | Repair the open or high resistance in the park lamps supply voltage circuit. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 8 | -- |
7 | Replace or repair the inoperative bulb/socket. Did you complete the repair? | Go to Step 8 | -- |
8 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 3 |