GM Service Manual Online
For 1990-2009 cars only
Makes
🢒
Chevrolet
🢒
2009
🢒
Avalanche - 2WD
🢒
Body Repair
🢒
Frame and Underbody
🢒 Steering Linkage Inner Tie Rod Replacement
Special Tools
J 34028
Inner Tie Rod Wrench
Removal Procedure
Remove the engine shield, if equipped. Refer to
Engine Shield Replacement
.
Remove the steering linkage outer tie rod. Refer to
Steering Linkage Outer Tie Rod Replacement
.
Remove the steering linkage inner tie rod (1) from the relay rod using wrench
J 34028
(2).
Installation Procedure
Remove all traces of oil, grease, or other contaminants.
Clean the threads of the steering linkage inner tie rod with denatured alcohol or the equivalent and allow to dry.
Apply red LOCTITE™ threadlocker, GM P/N 12345493 (Canadian P/N 10953488) to the threads of the steering linkage inner tie rod.
Caution:
Refer to
Fastener Caution
in the Preface section.
Install the steering linkage inner tie rod (1) to the relay rod using wrench
J 34028
(2) and tighten to
100 N·m (74 lb ft)
.
Install the steering linkage outer tie rod. Refer to
Steering Linkage Outer Tie Rod Replacement
.
Install the engine shield, if equipped. Refer to
Engine Shield Replacement
.
Adjust the front toe. Refer to
Wheel Alignment - Steering Wheel Angle and/or Front Toe Adjustment
.