Step | Action | Yes | No | ||||
---|---|---|---|---|---|---|---|
Schematic Reference: Instrument Cluster Schematics Connector End View Reference: Instrument Panel, Gages, and Console Connector End Views , Powertrain Control Module Connector End Views , or Powertrain Control Module Connector End Views | |||||||
1 | Did you perform the Instrument Cluster Diagnostic System Check? | Go to Step 2 | |||||
2 |
Does the Engine Oil Level Switch parameter display Ok? | Go to Step 3 | Go to Step 4 | ||||
3 | Does the CHECK ENG OIL LEVEL indicator remain illuminated after the displays test? | Go to Step 11 | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | ||||
4 |
Does the Engine Oil Level Switch parameter display Ok? | Go to Step 6 | Go to Step 5 | ||||
5 | Test the signal circuit of the engine oil level switch for a short to battery voltage, for an open or for a high resistance. Refer to Circuit Testing and to Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 12 | Go to Step 8 | ||||
6 | Test the ground circuit of the engine oil level switch for an open or for a high resistance. Refer to Circuit Testing and to Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 12 | Go to Step 7 | ||||
7 | Inspect for poor connections at the harness connector of the engine oil level switch. Refer to Testing for Intermittent Conditions and Poor Connections and to Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 12 | Go to Step 9 | ||||
8 | Inspect for poor connections at the harness connector of the PCM. Refer to Testing for Intermittent Conditions and Poor Connections and to Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 12 | Go to Step 10 | ||||
9 | Replace the engine oil level switch. Refer to the following procedures:
Did you complete the replacement? | Go to Step 12 | -- | ||||
10 |
Important: Program the replacement PCM. Replace the PCM. Refer to the following procedures:
Did you complete the replacement? | Go to Step 12 | -- | ||||
11 |
Important: Program the replacement IPC. Replace the IPC. Refer to Instrument Cluster Replacement . Did you complete the replacement? | Go to Step 12 | -- | ||||
12 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |