Callout | Component Name | ||||||
---|---|---|---|---|---|---|---|
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed. The High Voltage Disabling procedure will perform the following tasks:
Preliminary Procedures:
| |||||||
1 | Generator Battery Vent Fan Relay Procedure:After relay has been replaced, enable the HV system. Refer to High Voltage Enabling . |