Step | Action | Values | Yes | No |
---|---|---|---|---|
1 | Did you review the Battery Description and Operation , the Starting System Description and Operation and the Charging System Description and Operation and perform the necessary inspections? | -- | Go to Step 2 | |
2 |
Does the scan tool indicate the voltage is within the specified value? | 11-15.5 V | Go to Step 3 | Go to Testing for Intermittent Conditions and Poor Connections |
3 |
Is the generator output within 10 A of the specified value? | 85 A | Go to Step 9 | Go to Step 4 |
4 |
Is the voltage above the specified value? | 0.5 V | Go to Step 6 | Go to Step 5 |
5 |
Is the voltage above the specified value? | 0.5 V | Go to Step 7 | Go to Step 8 |
6 | Test the battery positive circuit between the generator output terminal and the battery positive terminal for a high resistance. Refer to Circuit Testing and Wiring Repairs . Did you find and correct the condition? | -- | Go to Step 9 | Go to Step 7 |
7 | Repair the high resistance in the ground circuit between the generator housing and the battery negative terminal. Refer to Circuit Testing and Wiring Repairs . Did you complete the repair? | -- | Go to Step 9 | -- |
8 | Replace the generator. Refer to Generator Replacement . Did you complete the repair? | -- | Go to Step 9 | -- |
9 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | Go to Step 3 |