Transmission Fluid Cooler Flushing J-45096
GM studies indicate that plugged or restricted transmission oil coolers and pipes cause insufficient transmission lubrication and elevated operating temperatures which can lead to premature transmission failure. Many repeat repair cases could have been
prevented by following published procedures for transmission oil cooler flushing and flow checking. This procedure includes flow checking and flushing the auxiliary transmission oil cooler, if equipped.
Important: Use the
J 45096 or equivalent to flush and flow test the transmission oil cooler and the oil cooler pipes after the transaxle is removed for repairs.
The tool may be adapted for use on this vehicle by dealership personnel with a barbed hose connector and rubber hose obtained locally. This transmission has a transmission oil requirement which maybe slightly different than DEXRON® III ATF. However,
flushing the cooler with DEXRON® III automatic transmission fluid is an acceptable service procedure. Very little fluid remains in the cooler after the flush procedure and the residual DEXRON® III ATF in the cooler is compatible with this vehicle's transmission
fluid.
Important: Only use the specified automatic transmission fluid after doing a repair on this transmission. Refer to
Fluid and Lubricant Recommendations
Cooler Flow Check and Flushing Steps
- Machine Set-up
- Determine Minimum Flow Rate
- Back Flush
- Forward Flush
- Flow Test
- Code Recording Procedure
- Clean-up
Tools Required
• | J 45096 Transmission Oil Cooling System Flush and Flow Test Tool |
• | Shop air supply with water/oil filters, regulator and pressure gage -- minimum 90 psi |
Machine Set-up
- Verify that the main power switch (1) is in the OFF position.
- Place the main function switch (2) in the IDLE position.
- Connect
J 45096 to the vehicle 12-volt DC power source by connecting the red battery clip to the positive (+) battery post on the vehicle and connect the negative (-)
lead to a known good chassis ground.
- Turn the main power switch to the ON position.
Notice: Do not overfill the supply vessel. Damage to the unit may result. To
verify the fluid level, view the LCD screen display while filling the unit,
to ensure the fluid level does not exceed 30 L (32 qt).
- Fill the supply tank with Dexron®III or equivalent, through the fill port.
- Install and tighten the fill cap.
- Connect a shop air supply hose to the quick-disconnect on the rear panel marked SUPPLY AIR.
Determine Minimum Flow Rate
- From the machine display, identify the temperature of the automatic transmission fluid that is stored in the supply vessel of
J 45096 .
- Determine whether the transmission oil cooler is steel or aluminum by using a magnet (1) at the cooler flange (2) at the radiator.
- Refer to the table below. Using the temperature from step 1, locate on either the Steel MINIMUM Flow Rate table or the Aluminum MINIMUM Flow Rate table the minimum flow rate in gallons per minutes (GPM). Record the minimum flow rate in GPMs
and the supply fluid temperature for further reference.
Example:
• | Fluid temperature: 75°F |
| The MINIMUM flow rate for this example would be 0.8 GPM. |
- Inspect transmission oil cooler lines for damage or kinks that could cause restricted oil flow. Repair the lines as necessary.
Minimum Flow Rate in Gallons Per Minute (GPM)
Temperature Range
| Steel
| Aluminum
|
65-66°F
| 0.6 gpm
| 0.5 gpm
|
67-70°F
| 0.7 gpm
| 0.6 gpm
|
71-75°F
| 0.8 gpm
| 0.7 gpm
|
76-80°F
| 0.9 gpm
| 0.8 gpm
|
81-84°F
| 1.0 gpm
| 0.9 gpm
|
85-89°F
| 1.1 gpm
| 1.0 gpm
|
90-94°F
| 1.2 gpm
| 1.1 gpm
|
95-98°F
| 1.3 gpm
| 1.2 gpm
|
99-103°F
| 1.4 gpm
| 1.3 gpm
|
104-108°F
| 1.5 gpm
| 1.4 gpm
|
109-112°F
| 1.6 gpm
| 1.5 gpm
|
113-117°F
| 1.7 gpm
| 1.6 gpm
|
118-120°F
| 1.8 gpm
| 1.7 gpm
|
Back Flush Procedure
- Connect the
J 45096 adapters (1) to the vehicle's transmission oil cooler supply and return lines at the transmission, may require
J 35944-200 .
- Connect the black supply hose (1) to the return line, top connector of the transmission, and the clear waste hose (2) to the feed line, bottom connector of the transmission, to the vehicle cooler lines. This is the
reverse flow-backflush direction.
- Turn the main function switch to the FLUSH position. Allow the machine to operate for 30 seconds.
- Turn the main function switch to the IDLE position and allow the supply vessel pressure to dissipate.
Forward Flush
- Disconnect the supply and waste hoses from the vehicle cooler lines. Reverse the supply and waste hoses to provide a normal flow direction.
- Turn the main function switch to the FLUSH position and allow the machine to operate for 30 seconds.
Flow Test
Important: If the flow rate is less than 0.5 gpm, the LCD displays an error message. Refer to the Troubleshooting section of the operation manual.
- Turn the main function switch to the FLOW position and allow the oil to flow for 15 seconds. Observe and note the flow rate. This is the TESTED flow rate.
- Compare the TESTED flow rate to the MINIMUM flow rate information previously recorded.
• | If the TESTED flow rate is equal to or greater than the MINIMUM flow rate recorded, the oil cooling system is functioning properly. Perform Code Recording Procedure. |
• | If the TESTED flow rate is less than the MINIMUM flow rate previously recorded, repeat the back flush and forward flush procedures. |
- If the TESTED flow rate is less than the MINIMUM flow rate after the second test, perform the Code Recording Procedure.
3.1. | Replace the transmission oil cooler. |
3.2. | Connect the supply and waste hoses to the cooler lines in the normal flow direction. Perform the Flow Test. |
3.3. | Perform the Code Recording Procedure. |
Code Recording Procedure
- Turn the main function switch to the CODE position.
Important:
• | If power is interrupted prior to the recording of the seven-character code, the code will be lost and the flow rate test will need to be repeated. |
• | The flow test must run for a minimum of 8-10 seconds and be above 0.5 gpm for a code to be generated. |
- Record TESTED flow rate, temperature, cycle and seven-character flow code information on the repair order.
Clean-Up
- Turn the main function switch to the IDLE position and allow the supply vessel pressure to dissipate.
- Turn the main power switch to the OFF position.
Important: A small amount of water may drain from the bottom of the unit when the air supply is disconnected. This is a normal operation of the built-in water separator.
- Disconnect the supply and waste hoses and the 12-volt power source from the vehicle.
- Disconnect the air supply hose from
J 45096 .
- Dispose of the waste ATF in accordance with all applicable federal, state, and local requirements.
Transmission Fluid Cooler Flushing J-35944-A
GM studies indicate that plugged or restricted transmission oil coolers and pipes cause insufficient transmission lubrication and elevated operating temperatures which can lead to premature transmission failure. Many repeat repair cases could have been
prevented by following published procedures for transmission oil cooler flushing and flow checking. This procedure includes flow checking and flushing the auxiliary transmission oil cooler, if equipped.
Important: Use the
J 45096 or equivalent to flush and flow test the transmission oil cooler and the oil cooler pipes after the transaxle is removed for repairs.
The tool may be adapted for use on this vehicle by dealership personnel with a barbed hose connector and rubber hose obtained locally. This transmission has a transmission oil requirement which maybe slightly different than DEXRON® III ATF. However,
flushing the cooler with DEXRON® III automatic transmission fluid is an acceptable service procedure. Very little fluid remains in the cooler after the flush procedure and the residual DEXRON® III ATF in the cooler is compatible with this vehicle's transmission
fluid.
Important: Only use the specified automatic transmission fluid after doing a repair on this transmission. Refer to
Fluid and Lubricant Recommendations
Cooler Flow Check and Flushing Steps
- Machine Set-up
- Determine Minimum Flow Rate
- Back Flush
- Forward Flush
- Flow Test
- Code Recording Procedure
- Clean-up
Tools Required
• | J 45096 Transmission Oil Cooling System Flush and Flow Test Tool |
• | Shop air supply with water/oil filters, regulator and pressure gage -- minimum 90 psi |
Machine Set-up
- Verify that the main power switch (1) is in the OFF position.
- Place the main function switch (2) in the IDLE position.
- Connect
J 45096 to the vehicle 12-volt DC power source by connecting the red battery clip to the positive (+) battery post on the vehicle and connect the negative (-)
lead to a known good chassis ground.
- Turn the main power switch to the ON position.
Notice: Do not overfill the supply vessel. Damage to the unit may result. To
verify the fluid level, view the LCD screen display while filling the unit,
to ensure the fluid level does not exceed 30 L (32 qt).
- Fill the supply tank with Dexron®III or equivalent, through the fill port.
- Install and tighten the fill cap.
- Connect a shop air supply hose to the quick-disconnect on the rear panel marked SUPPLY AIR.
Determine Minimum Flow Rate
- From the machine display, identify the temperature of the automatic transmission fluid that is stored in the supply vessel of
J 45096 .
- Determine whether the transmission oil cooler is steel or aluminum by using a magnet (1) at the cooler flange (2) at the radiator.
- Refer to the table below. Using the temperature from step 1, locate on either the Steel MINIMUM Flow Rate table or the Aluminum MINIMUM Flow Rate table the minimum flow rate in gallons per minutes (GPM). Record the minimum flow rate in GPMs
and the supply fluid temperature for further reference.
Example:
• | Fluid temperature: 75°F |
| The MINIMUM flow rate for this example would be 0.8 GPM. |
- Inspect transmission oil cooler lines for damage or kinks that could cause restricted oil flow. Repair the lines as necessary.
Minimum Flow Rate in Gallons Per Minute (GPM)
Temperature Range
| Steel
| Aluminum
|
65-66°F
| 0.6 gpm
| 0.5 gpm
|
67-70°F
| 0.7 gpm
| 0.6 gpm
|
71-75°F
| 0.8 gpm
| 0.7 gpm
|
76-80°F
| 0.9 gpm
| 0.8 gpm
|
81-84°F
| 1.0 gpm
| 0.9 gpm
|
85-89°F
| 1.1 gpm
| 1.0 gpm
|
90-94°F
| 1.2 gpm
| 1.1 gpm
|
95-98°F
| 1.3 gpm
| 1.2 gpm
|
99-103°F
| 1.4 gpm
| 1.3 gpm
|
104-108°F
| 1.5 gpm
| 1.4 gpm
|
109-112°F
| 1.6 gpm
| 1.5 gpm
|
113-117°F
| 1.7 gpm
| 1.6 gpm
|
118-120°F
| 1.8 gpm
| 1.7 gpm
|
Back Flush Procedure
- Connect the
J 45096 adapters (1) to the vehicle's transmission oil cooler supply and return lines at the transmission, may require
J 35944-200 .
- Connect the black supply hose (1) to the return line, top connector of the transmission, and the clear waste hose (2) to the feed line, bottom connector of the transmission, to the vehicle cooler lines. This is the
reverse flow-backflush direction.
- Turn the main function switch to the FLUSH position. Allow the machine to operate for 30 seconds.
- Turn the main function switch to the IDLE position and allow the supply vessel pressure to dissipate.
Forward Flush
- Disconnect the supply and waste hoses from the vehicle cooler lines. Reverse the supply and waste hoses to provide a normal flow direction.
- Turn the main function switch to the FLUSH position and allow the machine to operate for 30 seconds.
Flow Test
Important: If the flow rate is less than 0.5 gpm, the LCD displays an error message. Refer to the Troubleshooting section of the operation manual.
- Turn the main function switch to the FLOW position and allow the oil to flow for 15 seconds. Observe and note the flow rate. This is the TESTED flow rate.
- Compare the TESTED flow rate to the MINIMUM flow rate information previously recorded.
• | If the TESTED flow rate is equal to or greater than the MINIMUM flow rate recorded, the oil cooling system is functioning properly. Perform Code Recording Procedure. |
• | If the TESTED flow rate is less than the MINIMUM flow rate previously recorded, repeat the back flush and forward flush procedures. |
- If the TESTED flow rate is less than the MINIMUM flow rate after the second test, perform the Code Recording Procedure.
3.1. | Replace the transmission oil cooler. |
3.2. | Connect the supply and waste hoses to the cooler lines in the normal flow direction. Perform the Flow Test. |
3.3. | Perform the Code Recording Procedure. |
Code Recording Procedure
- Turn the main function switch to the CODE position.
Important:
• | If power is interrupted prior to the recording of the seven-character code, the code will be lost and the flow rate test will need to be repeated. |
• | The flow test must run for a minimum of 8-10 seconds and be above 0.5 gpm for a code to be generated. |
- Record TESTED flow rate, temperature, cycle and seven-character flow code information on the repair order.
Clean-Up
- Turn the main function switch to the IDLE position and allow the supply vessel pressure to dissipate.
- Turn the main power switch to the OFF position.
Important: A small amount of water may drain from the bottom of the unit when the air supply is disconnected. This is a normal operation of the built-in water separator.
- Disconnect the supply and waste hoses and the 12-volt power source from the vehicle.
- Disconnect the air supply hose from
J 45096 .
- Dispose of the waste ATF in accordance with all applicable federal, state, and local requirements.
Transmission Fluid Cooler Flushing Flushing Procedure
Flushing Procedure
- Drain the fluid from the transaxle and refill the transaxle with new transaxle fluid. Refer to
Transmission Fluid Draining .
- Let the engine idle for 5 minutes
- Drain the fluid from the transaxle and refill the transaxle with new transaxle fluid. Refer to
Transmission Fluid Draining .